Current Works
Suburban Rail Loop Authority is undertaking geotechnical investigations as part of the early planning and design work that will help determine the rail alignment and station locations.
These works involve drilling in indicative investigation areas near the proposed alignment for the south east section of Suburban Rail Loop. It is important we do these investigations to capture initial data and information about local ground conditions.
This page is updated as new works get underway, so you can find out what’s happening in your area.
Works continuing safely
Suburban Rail Loop is an important state infrastructure project and geotechnical investigations are continuing with strict health and safety measures in place.
Safety measures across our sites include temperature screening, additional protective equipment, enhanced cleaning and physical distancing.
October 2020
- Clayton Road Activity Centre, Clayton site investigations (PDF)
- Glen Waverley Car Park, Glen Waverley site investigations (PDF)
- Box Hill Activity Centre and Box Hill Gardens, Box Hill site investigations (PDF)
- Waverley Road, Glen Waverley site investigations (PDF)
September 2020
July 2020